Tiny Apartment Renovierung geht weiter! 👷‍♂️ | Wohnungsprojekt #7

Aug 23, 2022

Tiny Apartment Renovierung geht weiter! 👷‍♂️ | Wohnungsprojekt #7

welcome to

apartment

project number 7 the project in which i buy an

apartment

renovate circles and remodel according to my dreams and yours the disassembly has finally come to an end we have come to the reconstruction from electrical planning to new water pipes and new walls is pretty much everything in this episode i wish you a lot of fun episode number 7 before it really starts don't forget to subscribe to the channel so you don't miss any of the next videos and to support me also it is rumored that in the coming weeks the help of the lions will finally continue and now you have a lot of fun with this video.
tiny apartment renovierung geht weiter wohnungsprojekt 7
We also started to replan all the electronics and the year for the third time. In fact, we meet with the power company from time to time and replan everything again. when, of course, it is important that light switches and sockets are exactly where we are, you in the new design of the

apartment

need the same Of course that applies to my cell phone, of course, the same applies to lighting all over the

apartment

and in the bathroom and other cool things that we had to come up with special ideas for because we remember the last episode now the only question is exactly what we want we came up with and then implement right into this episode, you will find out later that the housing project is finally moving forward, we can continue with the electricity even though the water is not working and I became absolutely professional. support for that if you are thinking of your favorite streetwear store in germany, maybe even abroad, then this company almost certainly had a hand in the cake alex will not support you here in the

apartment

we have thought of sick things and in the next few days alex and his colleagues will be planning to redo everything in the

apartment

here everything is already planned and then it can be done tomorrow so let the dressings start from slots new lines new layout and so placed and of course let them comment tomorrow for that they can explain why it might be smart to have it done by professionals, as I have always said with electricity and water, maybe it would be better if they go to the professionals, that means they can get angry, then tomorrow it will finally continue after seven days of stoppage and there is also very good news elsewhere, well the company that does all the electrical and lighting planning with me and for my.
tiny apartment renovierung geht weiter wohnungsprojekt 7
It's called systems and I thank you infinitely that you regretted not supporting this little project, in fact you said that you had never put so much work into such a small department, that makes me happy, of course, and on the other hand, I appreciate even more that you've decided to take on this project, you actually do something like that here, really top-notch work, if you do it at all. If you need electrical planning, electrical implementations, lighting design, etc., for new buildings or existing properties, this is definitely the right company for you. This project is working and it's amazing.
tiny apartment renovierung geht weiter wohnungsprojekt 7
Thank you very much, have fun. Continue with the video. lots of things i wasn't even aware of before installing a bathroom rain shower we don't need a bigger passage to make a bigger one to be able to install instantaneous water heaters we need a higher fused line to install a line higher fused we need a new switch cabinet because the current switch cabinet has very little space here in our old switch cabinet it looked out 15cm the door slammed against it which of course is more complete nonsense we didn't want that they locked us in here they completely went through the entire

apartment

all sockets are still used here we continue to sweat in the hochstadt party night once upstairs for indirect lighting here electricity for mirror lighting then through the wall to our new switch cabinet an absolute marvelous dream here with effi by the ordinance what is done a jump s You always have to install fg, it's also super useful, that means here, and it simply means that you plug in and the power goes out and nothing happens to you.
tiny apartment renovierung geht weiter wohnungsprojekt 7
That's fine, and we even have new plugs here that our television program can solve here now. and we want to put it on the wall in general i thought about it because i also wanted to understand how to explain to you exactly how electricity works that thing is that it is protected profession and that is why it should not be messed with and i really don't see myself in the mi r position for look for something together somewhere on the Internet and then tell him about it. There are also reasonable YouTube channels here that provide more detail if you're interested.
tiny apartment renovierung geht weiter wohnungsprojekt 7
This is one of them. The links are all in the video description under Consultation with our carpenter. , which makes a complete installation solution for the

apartment

for a built-in wardrobe, equipped kitchen, a bed, etc., we have decided to let almost everything that bothers us in the

apartment

disappear in the built-in wardrobe, that is, a new cabinet of breakers, a new and larger instant water heater and the new main lockout used to have something for a main water shutoff up to that point we hadn't even had an announcement from the property manager yeah that's actually true , but a short time after the last video was posted the property manager contacted us and finally gave her google but not only a new water head conclusion but also an elevator which was great. st because it really gives us complete peace for the next 20 25 30 years and we can close the walls again with a clear conscience so that the guys from the sak can really replace the riser and at the same time lay the main water connection because I don't want it anymore in the bathroom everything should have a clean look now we want to put them in the cupboard so it needs to be in other positions for that i have to take out the drywall now i have done it before with tobi so the support from the painter uw master profile on the floor and on the ceiling the profiles spaced 62 centimeters from each other put the panels then some sound insulation underneath and so on if i can do it alone now we'll see if i've remembered everything well i'm curious the band it's fully on track, it escapes now, here, somehow, profile, they reach the floor and ceiling, the others profile.
tiny apartment renovierung geht weiter wohnungsprojekt 7
We immediately adjust vertically again who is now here in a line now we can line each one up like this for basics sake but that's how you'll be standing here you're pretty good but so the neighbors don't hear everything from my tenants or potentially anyone from you guys now we'll put the sound of the footsteps underneath and in principle we can fix the ambient profiles and then start with the actual setup where you move in and then in the planned time lab and very simple little trick we have cues from 40mm long so how do we know we don't drill unnecessarily deep beforehand we just measure ourselves beauty queen hello we only have to drill up to 40mm beforehand it turns on more it's more than maneuverable and then we were right up to the adhesive tape should understand the profiles above and below now let's take a profile, for example, two meters long we don't have that much to ceiling height I want now with the laser measuring device always exactly at the point of the ceiling height which will hopefully not change too much in these two meters now we will measure the two centimeters so that it is still possible to move back and forth and then it clamps down and then we can basically start all the salmon with the government at large. just repeated it so I like the determinability 2497 millimeters two centimeters of 2000 doesn't have to be 100 percent accurate I figure cutting it as short as possible but my favorite part all of this we're talking about this but paying more and more I've done quite a bit in the office and now I understand how it turns out my dear friends as you can see the frame is standing and now you can start with it ngen to shoot the plasterboard plates everywhere very important without crosses the plates need to be offset again and again just start here and because things are sunk by a don't be mad at the painter everything here will be plastered and smoothed after so that means it will get you must be really almost lost the painter is very easy and i can't get in the cover four months ago i thought jokingly i just need the office in the

apartment

s now i'm here just project and i drew the wall completely by myself so no kidding when I say that it really inspires me to learn the trade which is unbelievably cool and also the cooperation between the Bavarian trades where three videos came out that really came from the heart I want to inspire you by suntech that's really cool and of course I already have it I saw some comments yeah do it for 40 years easy to say i sure don't know.
I mean, it's going to be five days a week for the next 40 years, but I think it's really important that everyone tackles it somehow, just try it out, and then see how much fun it is for them, is it enough for a job, and is it worth it? you do moderately like me it's definitely awesome it's complete and linked and you can see what you're doing important it really took an hour and a half we've had five days of experience really amazing that's it why do we do it now and why do we flank mostly just one side is totally compliant with this pipe here it's broken now we've agreed with the property manager that not only that will be done but the entire riser as well which is super awesome because having absolute certainty having everything that has to do with water in this

apartment

is completely up to date, but also having the option of having a water tap pt with which we can reuse all the water in the

apartment

, which is actually very broken, to take it out of the town hall and put it on top and thus make it disappear in the cupboard, but the bathroom clearly has no air conditioning and the main water tap is still perfectly reachable, besides, the electricians can now take care of collecting dust here in the open side of all the wires, now we've left them hanging here and then they'll hang too. it will be dusted, everything will be insulated and then at some point it will first be plastered and just with that you can imagine that here on this page is the kitchen but not only did I come up with something really cool together with the carpenter here comes the genetics comes the bed and here in the fully open area it will be in my living room and it stays super hero it's really cool we leave the hallway completely fen and overall it looks much bigger than I'm really pumping thank you so much again to markus for the suggestion to do everything like this.
Now I've changed it a bit but I'm very happy with it and most of all it's finally going above and beyond what was finally done sak company was finally able to take it upon themselves to replace the riser to make sure the water was shut off throughout this part of the house, flexing the old line and inserting the new one, the problem with The thing, I didn't think it through, I thought I was super smart when I built the drywall and I saw that there are also significantly narrower profiles by 4 cm in instead of three and a half centimeters which means a thinner wall is great and loses less space in the

apartment

so i decided to close the wall as thin as war construction problems the wall is so thin we can't pull any cable in the wall on one side of the wall the new kitchens are being built for which we naturally need water and sewage that simply does not fit into the profile thickness of 4 cm really very is thick and that in turn means that the wall is absolutely unusable and we need a profile that is 2.5 cm thicker an hour and a half two hours completely set in the sand, but drywall with a profile thickness of three centimeters and they hold up half, which means we can now put and drain the water through this junction box, everything fits wonderfully well, you learn from your mistakes Meanwhile, I'm the fastest drywall builder in Germany, of course not they are nowhere near the pros again, much faster and can do much better.
However, I was able to gain experience. In the end, it was absolutely stupid, but still everything works. in the next few weeks all the different trades like us are still helping to build the bathroom building more stuff to build to lay the foundation and be able to keep working more or less in parallel we feel like we are now in the final sprint and it's absolutely clear what you have what will happen, who will do it, when and who will continue to build on the basis of the

apartment

I am afraid there is a big project that I am participating in but I can't tell you anything yetThat's why we don't have to go abroad anytime soon, but we are still working on it

apartment

and more videos will come.
If you liked this video, give it a light thumbs up, don't forget to subscribe to the channel and we'll see you again in the coming weeks, where by the way, The Lion's Cave is finally coming again.